Failure of the existing air conditioning on the old ‘Ozone depleting’ R22 refrigerant which required a complete new upgrade. We utilised the existing pipe work keeping costs to a minimum. Cleaned and pressure tested them then installed a new energy efficient heat pump ceiling cassette. Works were carried out after shop working hours to keep disruptions to a minimum.